FDH Infrastructure Services

Determining Bridge Pile Lengths for North Carolina DOT

FDH was hired by the NCDOT Hydraulics Division to determine the unknown lengths of 350 existing bridge piles and foundation (abutment) sizes for timber and concrete bridge types. Evaluations were also conducted of the thalweg and streambed profiles of each of the bridge locations.

Share this:

Share this:
  • Location

    State of North Carolina

  • Year Completed

    2011

  • Services

  • Markets

Contact Our Team

Do you have a similar project we can help with? Please submit this form with your name, email address, phone number, and brief message. A member of our team will contact you shortly. Thank you.

  • This field is for validation purposes and should be left unchanged.

  • Corporate Headquarters
  • 6521 Meridien Drive
    Raleigh, NC 27616