During construction of new transmission towers in a marshy area, FDH calculated a safe load bearing access matting for heavy equipment to operate and carry large construction materials across the low-strength soil conditions. FDH evaluated the soil and other environmental concerns, such as elevation and grade. Mat strength, allowable soil bearing pressure, deflections, and duration of load were all taken into consideration for the mat design. This enabled safer and more effective construction of the transmission towers in a challenging landscape.

Share this:

Share this:
  • Location

    NJ

  • Year Completed

    2016

  • Services

  • Markets

Contact Our Team

Do you have a similar project we can help with? Please submit this form with your name, email address, phone number, and brief message. A member of our team will contact you shortly. Thank you.

  • This field is for validation purposes and should be left unchanged.

  • Corporate Headquarters
  • 6521 Meridien Drive
    Raleigh, NC 27616